Start with the people and systems

Record the work areas, meeting rooms, phones, wireless access points and business systems that need a connection. Include likely changes to the layout.

Map the physical constraints

Identify the proposed rack location, cable routes and access restrictions. Coordinate these with the fit-out team before ceilings and finishes are completed.

Agree what handover includes

Discuss labelling, drawings, test records and equipment information at the scoping stage. A clear handover makes later changes easier.

General planning guidance. The appropriate design and scope depend on your site and business requirements.